Old Lynhurst Road Improvements: Phase 3

Share on Facebook Share on Twitter Share on Linkedin Email this link

The Old Lynhurst Road Improvements Phase 3 project will finish off the multi-phase road and storm sewer improvements project on Crescent Avenue. The work area will be situated between Wellington Road and approximately 450m east.

The project scope includes installation of:

  • New storm sewer
  • Storm sewer service connections
  • A limited portion of new watermain and water service connections
  • Urban road cross section with sidewalk on the south side
  • Improved outlet structures and erosion measures into the two branches of the Dodd Creek Tributary.

Van Bree Drainage and Bulldozing Ltd. will be the Contractor for this project.

The Old Lynhurst Road Improvements Phase 3 project will finish off the multi-phase road and storm sewer improvements project on Crescent Avenue. The work area will be situated between Wellington Road and approximately 450m east.

The project scope includes installation of:

  • New storm sewer
  • Storm sewer service connections
  • A limited portion of new watermain and water service connections
  • Urban road cross section with sidewalk on the south side
  • Improved outlet structures and erosion measures into the two branches of the Dodd Creek Tributary.

Van Bree Drainage and Bulldozing Ltd. will be the Contractor for this project.

  • Notice of Construction Sent Out!

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    Please see the Documentation section for the latest construction notice sent out to residents in the area of construction.

  • Latest News

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    Please stay tuned for the latest news!